Excel VBA Course
Excel VBA Course - From Beginner to Expert

200+ Video Lessons
50+ Hours of Video
200+ Excel Guides

Become a master of VBA and Macros in Excel and learn how to automate all of your tasks in Excel with this online course. (No VBA experience required.)

View Course

(80% Discount Ends Soon!)

Close Window (X)   
Excel VBA Course
[80% Discount] Excel VBA Course - From Beginner to Expert

200+ Video Lessons
50+ Hours of Video
200+ Excel Guides

Become a master of VBA and Macros in Excel and learn how to automate all of your tasks in Excel with this online course. (No VBA experience required.)

View Course

(80% Discount Ends Today!)

Distance Between Two Points . .

Hi all,

I may be pushing the limits of this board with this question, but does anyone know if there is a code that can calculate the the distance between the latitude and longitude of two points on a map. For example, how can I calculate the distance between these two points. Thanks for any help.

.......................................Long: Lat:

Albuquerque NM -106.6225897 35.0846


Las Cruces NM -106.716125 32.6621


Excel VBA Course
Excel VBA Course - From Beginner to Expert

200+ Video Lessons 50+ Hours of Instruction 200+ Excel Guides

Become a master of VBA and Macros in Excel and learn how to automate all of your tasks in Excel with this online course. (No VBA experience required.)

(80% Discount Ends Soon!)

View Course




Similar Topics







I want to add data points to the scatter plot that are not part of the data
ie. add points to find their concentration on a standard curve.



Does anyone know if there is a customer format I can use to change the percent value of a cell to basis points? I tried creating my own, but was having difficulty. For example, if the cell value in A1 is 2%, I would like to have it say 200 basis points instead.

Thanks.


I'm trying to write a formula that will automatically take a group of football (soccer) scores, compare them with a set of predictions, and then allocate points according to how close the predictions are to the actual scores.

E.g.
Manchester United 3 - 0 Arsenal
Prediction: 4 - 1
Points: 1

I've found a formula online that works for most scores; the correct score (e.g. 3 - 0), a correct win (e.g. 4 - 1), and in the case of a draw (e.g Man Utd 1 - 1 Arsenal, and the prediction 2 -2), correct draw (but not the correct score). The points are as follows: Correct draw (Prediction = result): 4 Correct win (Prediction = result): 3 Correct win, incorrect score (Winner correct, score not): 1 Correct draw, incorrect sco 1

The formula I found online for all but the correct draw is: =IF(A3&B3=C3&D3),3,IF(AND(A3=B3,C3=D3),1,IF(AND(A3>B3,C3>D3),1,IF(AND(A3<B3,C3<D3),1,0)))))

Could someone help me work out how I can write a formula to add before the above that will check the contents of four cells (the home score, away score, home prediction, away prediction), and if the number in all 4 cells are the same, allocate 4 points? I've tried using averages, but some combinations would void this. I've also used the SUM function, but the same happens, as with MULTIPLYING.

Something like =IF(A3:D3) are equal, 4,0

Below are a few examples of what I mean:
(Result) (Prediction) (Points)
A B C D E
3 - 3 3 - 3 4
2 - 1 3 - 1 1
1 - 0 1 - 0 3
3 - 3 2 - 2 1

Apologies in advance if I haven't explained this clearly enough.

Thanks

Will


Very new in this board. If I post this question in the wrong forum please bear with me.
There is about 20 staffs in our department and I have made a spreadsheet with 12 tabs for each month of the year Jan-Dec. If each staff have 15 days annual leave each year and how can I make a formular that can automatically calculate the balance of annual leave and entered in the tabs of the following months. For example if staff A used 5 days in Jan how can the balance of 10days be entered in the tabs from Feb-Dec. If he use another 5 days in July the remain balance of 5 days be automatically entered in the tab from Aug to Dec. Likewise if staff A took 2 days sick leave in Jan, and 2 days in Mar how can this sick days be automatically sum up in the months after. I am doing this manually at the moment and it is very time consuming and also very easy to make mistake.
Thanks and sorry for this long questions


I have a workbook that I have unprotected (all - workbook & worksheets). However, I have a sheet that I know is there (because I created it) but I cannot unhide. I know it is there because in the Name Manager, it points to it. Any idea how I can unhide it?


Ok, I'm going to try and explain this. I am going to have 5 data points in cells such as A2:A6

All I need is to know if there is an upward trend or downward trend of the numbers.... I can't have something that simply takes the first and last number and checks if it's higher or lower. I need to actually see if they are trending upwards. Also how would i go about making it so that if they are trending upwards it shows an up arrow, and down arrow for downwards...

And finally, if the trend continues at the same rate, how long it will take the number to reach a goal. Each data point will be 1 week apart, with an ultimate goal needed to be achieved at the end.
This will be a completely separate formula on the sheet....

Any help?


I need a formula to calculate Turn Around Time. Find below the sample data and details for your reference.

Received Date & Time: 10/29/2010 3:27:00 PM
Completed Date & Time: 11/1/2010 3:57:32 AM
Business Hours: 08:00 AM to 05:00 PM
Non Business hours: 05:00 PM to 08:00 AM
Weekdays : Monday to Friday
Weekends: Saturday & Sunday

If I calculate TAT for this time period it should show me 1 hour 33 minutes, why because business hours are closing by 5:00 PM on 10/29 so it should not calculate duration after 5:00 PM to until 08:00 AM on next day, however 10/29 is Friday so formula should calculate the duration from 10/29 Friday 3:37 PM to 10/29 5:00 PM and again it should calculate from 8:00 AM on 11/01 Monday and formula should skip Saturday & Sunday.

In this scenario I have completed the task before 8:00 AM on 11/01 so it should show duration of 1hour 33 minutes.

Please let me know if you need any more details


Hello,

I have two columns of data: column A contains the date and time in the form dd/mm/yyyy. Column B contains a number value. All the times are in order, so column A looks like:

01/01/2007
02/01/2007
03/01/2007

I have data from 2007 to 2010. I need to calculate an average daily value (in column B) for each month, and display it in column C. So, for January, I need to calculate the average of 31 days, February, 28 days, etc.

Is there a function I can use to do this? I've been trying the AVERAGEIF formula but can't get it to work. Any ideas would be much appreciated!

Many thanks,
Caitlin


Good afternoon!

I'm working with Excel 2003 sp 3 on Windows xp.

I have been banging my head trying to jar loose the formula to calculate man days where 1 equals 8 hours. I have one that was given to me by a coworker:

=INT(Q3/8)+(((Q3/8)-(INT(Q3/8)))*0.8)

That calculates man days from total hours. I need a formula that will total man days and return the man day answer. Example:

weekending 12/25 = 16.2 which is 16 man days and 2 hours
weekending 1/1 = 24.7 which is 24 man days and 7 hours

Total = 41 man days and 1 hour

I have also been asked if there was a way for a number to be entered into a spreadsheet and automatically put in order without a macro or "pushing a button".

Any advice is greatly appreciated!

Happy New Year!

~ Brenda ~


I have a set of data about with approx 7500 cells all contained in one column. The data has a series of peaks that happen, and I need to identify each peak value and place it in a cell. The peak does not occur at regular intervals but they are somewhat regular, as in within 130-230 data points. So, if one could find the first peak in the first 200 cells, identify it and store it somewhere, then look in the next 200, store it, etc. I don't know how to do that in excel. Please help

Thanks
Jon


I have a spreadsheet where I need to calculate the increase in % one year over the other in column D for Eg if Profits are 95415 in Jan 2008 (Column B) and 80215 in Jan 2008 (Column C), then the % Increase will be (95415-80215)/80215 *100

I can calculate the formula for this , but the problem comes where for eg there is a loss in Jan 2008 for -95415 and there was a profit in Jan 2007 for 80215. How do I set up formula to take negatives & positives into account in calculating the increase or decrease/

Your assistance or anybody's on the forum will be greatly appreciated

Regards

Howard

http://www.mrexcel.com/forum/showthr...ghlight=howardneed


Hi there

I am trying to calculate our On Time Delivery. I want this as a simple percentage of jobs. I have got this running in the following way:

Column M - Estimated Delivery dates
Column N - Actual Delivery dates
Column O - =IF(SUM(M2-N2)>0,1,0)

Then I have calculated On Time Delivery as: =SUM((SUM(O2:O252))/(COUNTA(N2:N252)))

This seems to work fine. My problem is, if we enter a date in Estimated without a corresponding Actual date, the formula for Column O fills out anyway and improves our On Time Delivery Percentage. How can I set this up so that the formula doesn't calculate if there is no data in Column N?

Any help much appreciated

Thanks,

James


I need information on how to enter the proper syntax (formula) so that excel
can calculate overtime hours. In california over 8 hrs in one day is
overtime. The 8 would be considered regular hours and anything over is OT.



Happy Day to all,

Can you please help me,

A1= time in
B1= time out
C1= time in
D1= time out

I want to calculate the late and under time,
Office start at 9:am w/30 mins Grace period,
The break time is one hour only, please include over breaktime in calculation.
End of office hours 6:00 pm, strickly no over time


In Excel I have been trying to find an easier way to calculate a time
difference where the times cross midnight. Example:
Start time: 23:50:00
End time: 00:15:00

How would you formulate an equation to determine the duration of time or
differnce between the start and end time?



Hi Guys,
I need help....I am working production scheduling with Start and End time but there is a lunch time and tea time. Is there any formula to calculate Start time to End time with excluding lunch time?
Here is example :

Lunch time :12:00pm to 1:00pm.
Duration Process :6 hours.
Start Time (8:00am)
End time (5:00 pm)

I need a formula to calculate from Start Time 8:00am and what is the End Time? with 1 hour lunch time...

Thanks,
ET


This formula is supposed to calculate difference between today and date hired to give years and months of service. Works fine for all except if the person was hired in year 2000 then this formula shows 110 y. Any one know how to fix this? or have a different formula that works.

=DATEDIF(E21,TODAY(),"y")&" y "&DATEDIF(E21,TODAY(),"ym")&" m"

Thanks
Rick


Sale = A1
Cost = B1
Margin = C1

I know to calculate Margin its' C1=1-(B1/A1) and to calculate Sale its, A1=B1/(1-C1), and I can do that in separate columns. But...... I'm tasked with trying to find a way so that I can do it in three columns. As in if I change cost then margin recalculates or if I change margin then sale recalculates. I'm thinking that this is going to cause a circular error but my boss says there's got to be a way to do it, figure it out. Any suggestions?

Alex


How do I calculate the number of batches per hour? Here's what I have so far:

Cell B5: start time: 4:15 formatted as 4:15:00 am
Cell B6: finish time: 6:15 formatted as 6:15:00 am
Cell B7: total time: 2:00 formula in cell: =TEXT(B6-B5,"h:mm")
Cell B8: total batches processed: 22 (this is entered manually)
Cell B9: batches per hour: formula in cell: =B8/TEXT(B7,"h")

as long as I have this formula in cell B9 the answer comes out correct which should be 11 per hour.
If the formula in B9 is B8/B7, the answer is 264.0, Is this because of the way excel is reading the total time or the total time is formatted as a time, not an actual number? Is this the correct way to solve the problem?
answer should be 11 per hour.


I have an excel worksheet that adds two other worksheets in a data
triangle. I copied it to create a new data set and used find &
replace to change the worksheet references to the new ones.

The cells still contain the result of the old formula referring to the
previous worksheets. The only way I can get the formula to return the
correct result is to edit (F2) each cell and press enter. Calc now
(F9) does nothing.

I've seen this before, but this time, I need to calculate many
thousands of cells and don't have time for this workaround.

Any ideas?

Thanks.

Don S