Split Date Ranges Into Weeks |
Split Date Ranges Into Weeks - Excel |
|
I need a continuous list of start dates for each week in each of the periods in cells B20:B? (dependent on number of weeks in each period). Also need corresponding week end dates in cells C20:C?
So if B3 = 03/03/2008, C3 = 16/03/2008 and
B4 = 24/03/2008, C4 = 30/03/2008 then
B20 = 03/03/2008, C20 = 09/03/2008
B21 = 10/03/2008, C21 = 16/03/2008
B22 = 24/03/2008, C22 = 30/03/2008
Hope this is clear - sorry not allowed any downloads at work so can't display graphically.
Similar Topics
I can calculate the formula for this , but the problem comes where for eg there is a loss in Jan 2008 for -95415 and there was a profit in Jan 2007 for 80215. How do I set up formula to take negatives & positives into account in calculating the increase or decrease/
Your assistance or anybody's on the forum will be greatly appreciated
Regards
Howard
http://www.mrexcel.com/forum/showthr...ghlight=howardneed
Does anyone know of a way to unhide this macro?
Thanks!
I hope you can help me with what I would like to do. I've searched and searched and not come up with anything yet!!
I have one sheet which is my 'data' sheet with a number of columns, one of which is a date which may be repeated.
I then want to use another sheet with two cells where two dates can be entered and a button which allows you to copy the rows of data from the data sheet which have dates between the two specified originally. The list in the data sheet may not be in date order although I could update a macro to do this for me if needed. I would also like to do it so that if "ALL" is typed in the date fields, it pulls over ALL the data. (Or something similar)
Any help you can give would be much appreciated.
Cheers,
Kevin
Are there any ways around this so that it updates upon dragging the formula?
I'm still new here but after I searched the forum I found great work done
for the needy like me.
So I'm so hopeful
I'm concerned with making a timetable for my school which we used to do it manually
I need a code to distribute each teacher timetable with the following basis:
the number of classes_ the teacher is assinged to work with_multiplied by the number of periods ( which is changeable ).
e.g ; Teacher 1 has 2 classes (1-1 &1-2). Each class should be visited 9 timea a week.
So Teacher 1 should work 18 periods a week
the distribution I need 'd look like the example in Sheet("timetable")
Please don't let me down
any help 'd be greately appreciated
inbetween the two dates. Does anyone know how to then convert the number of
days into months?
I have formulas to add a number of days to a cell containing an entered date and display the resulting new date (ie. 03/01/2011 (c34)+11 = 03/12/2011)
I am seeking to leave resulting formula cell blank until a date is entered in the input cell. Currently when the input cell is empty the formula cell obviously displays 1/11/1900 using the above example.
What conditional format would achieve leaving the formula cell blank until date data in entered into the source cell?
Hopefully a simpler question for your experience level than mine.
Basically, I've got a sheet that contains a table of entries, and each entry gets a date stamp in the first column. I would like to have the sheet display the average time, in days, between entries. Is this possible?
Thank you in advance!
~cp
But I do not want to insert any sheet for different dates & also the format will not be copied & paste in the same sheet. Just at the place of Date the date will be changed & the datas will be entered manually for each day.
In future, when I shall put the date, the datas will show that particular date's datas only.
Can anyone help me ?
Thanks in advance for any assistance.
Mick
I am trying to calculate our On Time Delivery. I want this as a simple percentage of jobs. I have got this running in the following way:
Column M - Estimated Delivery dates
Column N - Actual Delivery dates
Column O - =IF(SUM(M2-N2)>0,1,0)
Then I have calculated On Time Delivery as: =SUM((SUM(O2:O252))/(COUNTA(N2:N252)))
This seems to work fine. My problem is, if we enter a date in Estimated without a corresponding Actual date, the formula for Column O fills out anyway and improves our On Time Delivery Percentage. How can I set this up so that the formula doesn't calculate if there is no data in Column N?
Any help much appreciated
Thanks,
James
I have sheet muster for my clients of January, 2005 like :
( P = Present, A=Absent )
A.....B.....C.....D.....
Days Sun Mon Tue Wed
Date 1 2 3 4
1 John P A A P
2 Lucy A P P A
3
Now I want to calculate the total Sundays, Mondays, Tuesdays etc. present in
that month. How can I do this?
--
Knowldege is Power
I have a file that has 8 sheets. the first seven sheets are the days of the week and the 8th sheet is where I want to calculate the hours.
The days of the week consists of "Name" "Date" Hours"
The 8th sheet consists of "Name", "Days of the week in their own column (7 columns in total)", "Total Hours" and "Total Days Worked"
Now... each day is always a different group and what I'm hoping for is to create a formula that can grab each name with their hours and throw them into the 8th sheet. So when the end of the week is done I have all the Employees weekly hours and days worked all finished.
I hope this makes sense. This file is to track about 100 employees that are on a rotational work schedule.
I have attached a sample file.
Thanks in advance for your help.
Mike
Here is the example.
Jan2011 Feb2011 Mar2011 Apr2011 May2011 Jun2011 Jul2011 Aug2011 Sep2011 Oct2011 Nov2011 Dec2011 ----------- ----------- ----------- ----------- ----------- ----------- ----------- ----------- ----------- ----------- ----------- ----------- Product XXXXX Actual/Forecast : 174 1674 574 574 524 524 524 524 524 728 728 728 New Purchases : 0 0 0 0 1002 0 0 0 0 0 0 0 Goods In Transit: 0 1506 0 0 0 0 0 0 0 0 0 0 Other Movements : 0 0 0 0 0 0 0 0 0 0 0 0 Closing Stock : 1270 1102 528 -46 432 -92 -616 -1140 -1664 -2392 -3120 -3848 Week Stock in Hand ? ? ? ? ? ? ? ? ? ? ? ?
So, in Month of Jan2011 the Closing stock is 1270, need a formula to calculate how many weeks will this stock cover look at future forecast.
Does anyone know a better way to do this?
Thanks in advance!
date (1/10/05) in cell A1 for example, then B1 automatically changes to
1/11/05, C1 to 1/12/05, etc. Can anyone help? Thanks!!
For example: Cell A1 has a time format (hh:mm) value of 04:00; which is the Start Time. I would like cell D1 to have a text format value of "04:00" (result is dependant upon what is entered in A1). I would duplicate the same formulas to reflect Stop Times in other cells.
My final result is to have another cell (F1) use the Concatenate formula to have the Start and Stop time shown in one cell as "04:00 - 12:30". The times would change based on the Time formated values entered into the Start and Stop time cells.
I have researched this in the board and found many excellent ways to do the opposite, but not convert Time format to Text format. Any assistance is greatly appreciated.
-Shane
current date when opened, using today(). Users then Save As to have an
archive copy of their spreadsheet. However, when they go back to access
their saved sheet, the date changes from the created date to the current
date. How do I stop this in Excel?
I know that Word lets you do this by changing the code from {DATE} to
{CREATEDATE}, but I can't find a similar setting in Excel.
Please help and thank you!