Quarterly Payment Dates |
Quarterly Payment Dates - Excel |
|
If I enter into a lease that starts on 1/1/07 I will have four payments in 2007. My payments are set up as quarterly in arrears so the first one will be due 4/1/07 the second will be due 7/1/07, the third 10/1/07 and the last on 1/1/08. Simple. Problem is, if I enter into a lease in some month other then January then I will end up not making 4 payments this year. I'd make at most 3 payments.
For cash flow purposes, I need to project into the future how many payments I will make on each lease each fiscal year. It will be four payments for each year other then the first and last year the lease is still active. To make matters worse, my fiscal year is 9/1 through 8/31 and leases are signed each month and generally with terms of 5 to 7 years.
The spreadsheet I use to track them includes a column for the first payment date, the last payment date (the last payment at the end of the lease term), the number of payments over the term, say 28 for a 7 year lease, and the payment amount per quarter. Then off to the right I simply fill in columns with a formula multipling the payment amount by the number of payments that will occure that fiscal year. One column per year 8 or so years into the future. Each column heading included the fiscal year i.e. "FY 2008".
I'm hoping someone has developed a formula that can determine how many payments will occure in each of the next 8 or so fiscal years based on the information I manually plug in now.
Similar Topics
so I thought I would try again.
Does anyone know of an Excel template--or a small stand-alone
program--that will calculate the interest/principal breakdown when
payments are varied in amount and frequency? Free or low-cost, please.
I need one that will work on my Mac/Office 2004. I will need to print
out periodic reports.
Here is the way the previous poster described it:
"Excel template: Loan Amortization for random/irregular payments,
figures days
between payment dates.
I have a loan with a variable beginning balance and irregular payments
with
annual large payment. (based on collections)
Would like to enter payment and date.
then Excel would figure days since last payment, interest amount,
principal
amount, Ending Principal balance.
And total interest paid, total pricipal paid
If I change the starting principal, excel would recalculate all
entries."
Thanks very much.
This is what I have so far (hire date is in column B):
=((TODAY()-B4)/365)&" YEARS"
This function gives me a number with many decimal places.
I tried:
=ROUNDDOWN((TODAY()-B4)/365),0)&" YEARS"
It tells me I have too few arguments. Please help!
There is about 20 staffs in our department and I have made a spreadsheet with 12 tabs for each month of the year Jan-Dec. If each staff have 15 days annual leave each year and how can I make a formular that can automatically calculate the balance of annual leave and entered in the tabs of the following months. For example if staff A used 5 days in Jan how can the balance of 10days be entered in the tabs from Feb-Dec. If he use another 5 days in July the remain balance of 5 days be automatically entered in the tab from Aug to Dec. Likewise if staff A took 2 days sick leave in Jan, and 2 days in Mar how can this sick days be automatically sum up in the months after. I am doing this manually at the moment and it is very time consuming and also very easy to make mistake.
Thanks and sorry for this long questions
=DATEDIF(E21,TODAY(),"y")&" y "&DATEDIF(E21,TODAY(),"ym")&" m"
Thanks
Rick
I can calculate the formula for this , but the problem comes where for eg there is a loss in Jan 2008 for -95415 and there was a profit in Jan 2007 for 80215. How do I set up formula to take negatives & positives into account in calculating the increase or decrease/
Your assistance or anybody's on the forum will be greatly appreciated
Regards
Howard
http://www.mrexcel.com/forum/showthr...ghlight=howardneed
I am entering lots of family history data into a spreadsheet. At the simplest I have columns (in cells A1 B1 C1) the headings, Surname, Forename, Year. Right now, I enter in cells A2 B2 and C2 say: Smith <Tab> John <Tab> 1555 <Enter, move mouse to the A column in the next row down). What I want to happen is when I have entered the last data in a row and pressed <Enter> I move automatically to the A-column in the next row down.
Is this possible?
Regards and a Merry Christmas to all
Wibs
I have two columns of data: column A contains the date and time in the form dd/mm/yyyy. Column B contains a number value. All the times are in order, so column A looks like:
01/01/2007
02/01/2007
03/01/2007
I have data from 2007 to 2010. I need to calculate an average daily value (in column B) for each month, and display it in column C. So, for January, I need to calculate the average of 31 days, February, 28 days, etc.
Is there a function I can use to do this? I've been trying the AVERAGEIF formula but can't get it to work. Any ideas would be much appreciated!
Many thanks,
Caitlin
I'm working with Excel 2003 sp 3 on Windows xp.
I have been banging my head trying to jar loose the formula to calculate man days where 1 equals 8 hours. I have one that was given to me by a coworker:
=INT(Q3/8)+(((Q3/8)-(INT(Q3/8)))*0.8)
That calculates man days from total hours. I need a formula that will total man days and return the man day answer. Example:
weekending 12/25 = 16.2 which is 16 man days and 2 hours
weekending 1/1 = 24.7 which is 24 man days and 7 hours
Total = 41 man days and 1 hour
I have also been asked if there was a way for a number to be entered into a spreadsheet and automatically put in order without a macro or "pushing a button".
Any advice is greatly appreciated!
Happy New Year!
~ Brenda ~
I want to show all figures in Lacs like value 235600 show 23.56
In previous year i divided all values one by one by inputting /100000 but its so tedious.
Pl help.
I am trying to calculate our On Time Delivery. I want this as a simple percentage of jobs. I have got this running in the following way:
Column M - Estimated Delivery dates
Column N - Actual Delivery dates
Column O - =IF(SUM(M2-N2)>0,1,0)
Then I have calculated On Time Delivery as: =SUM((SUM(O2:O252))/(COUNTA(N2:N252)))
This seems to work fine. My problem is, if we enter a date in Estimated without a corresponding Actual date, the formula for Column O fills out anyway and improves our On Time Delivery Percentage. How can I set this up so that the formula doesn't calculate if there is no data in Column N?
Any help much appreciated
Thanks,
James
Cells accept hours over 23,
Adding cells in column returns correct total time.
Have not found a way to multiply these cells by a $ hourly rate.
So use HOUR(cell ref) and MINUTE(cell ref) to capture values in referenced
cell - then use these values to calculate total payment for $rate per hour.
However, the HOUR(cell ref) formula returns the hours in excess of 24 when
the cell contains an hour value in excess of 23 (ie 27 hours returns 3).
Basically I have created a spreadsheet with several columns, but I have one column that lists the shirt size (YS, YM, YL, AS, AM, AL, XL, 2X, 3X) of each person. Is there a formula that I can create that will tabulate the number of sizes (i.e. AS=2, AM=7, etc.)?
In previous years I made a column for each size, and simply placed a "1" in the correct column, and had excel just add the 1's from each column. However, that takes more time and space. I was hoping to streamline it this time around.
Thanks for taking the time to read this post. Any help would be appreciated! Thanks, doug
James
What is the origin of the extra plus sign at the beginning? To me it seems to be unproductive and is simply not needed. I have been using Excel for over 12 years and have never needed to enter any formulas like that. Does this originate back to a much older version of Excel where it was once needed?
Just curious.
Thanks.
3 & 4 shifts = 15% Basic
2 shifts = 10% Basic
If on leave for 21 working days or more, no shift allowance
If on leave for less than 21 working days and on 3 or 4 shifts, shift allowance prorated as (Basic*15%)/21*(diff. btw 21 and no of days leave observed)
If on leave for less than 21 working days and on 2 shifts, shift allowance prorated as (Basic*10%)/21*(diff. btw 21 and no of days leave observed)
The formular I used in the attached worked but the only problem is that I had to sort by no. of shifts and adjust the formular first. I need A formular that does not require sorting. I tried to combine IF, AND, OR formulae but I got error. Please assist me sort this out. Thanks a bunch.
We will be building 8 "widgets" a day.
We will work 10 hours a day.
There is a 20 minute break at 9:20 am.
Production shuts down for lunch 30 minutes for lunch at 12:30.
Production starts at 6:00 am.
Here is what I can do.
Production cycle time = (10*60)-30/8 or 71.25 minutes
If we start at 6:00 am, the first scheduled cycle completion time = TIME(6,0,0+71.25/1440)
My problem is when I am trying to use a logical "IF' statement to account for the 20 minute break or lunch and still calculate the end of each cycle time through the day I receive a number of error messages.
This is the formula I am trying to make work. I have the cell the formula is in, formatted with a "mm,ss" format.
=(IF(D4+G1/1440>9:20,(D4+G1)/24,(D4+G1+15)/1440))
I have included an attachment to help (a picture is worth a thousand words).
Any help will be greatly appreciated.
I have bought a number of books in an attempt to figure this out, and I am still stumped