Secondary Data Axis Not Showing |
Secondary Data Axis Not Showing - Excel |
|
I created a Vertical bar chart with percentage on the right or as my secondary axis. I have to datasets referencing the secondary axis.
For whatever reasons, I cannot fine one of these datasets, which is suppose to be a straight line going across the chart & representing the goal - in this case 90% to reach.
How to find & unhide this dataset?
Thanks
Similar Topics
I have 3 variables that I'm charting. I have one on the primary axis and it's values are in the billions. I have one on the secondary axis and it's a percentage. I need to display a 3rd who's value is in the millions. If I put it on the primary axis, you cannot see modest changes.
Is there a tricky way to get all three on one graph? I know I could split on two graphs, so that's my backup plan.
Thanks,
Dave
Instead of the y axis being on the left hand side, i wish for it to cut at 0,0. I have positive and negative values and I need it to be in the centre instead of on the left.
I have tried formatting both the axis and it would appear that the x axis already cuts the y axis in the right posistion so i need to format the x axis to make the y axis cut it at 0,0. I have already tried typing in 0 instead of 1 and it keeps saying it need to be number more than or equal to 1.
Any help would be greatly appreciated.
Nicole
I was thinking of trying a nested if/and statement but I haven't quite figured out how to do it. Basically I want to identify the two values where it switches from positive to negative and also indentify the values where it goes negative to positive, I can then fit a straight line between them to find a better approximation of the intercept (though it might not be necessary). Preferably I'd like it all one function as I'm not doing it in VBA (I might do later though, we'll see).
Can anyone suggest how I'd find these value or the x-intercept. Any help would be greatly appreciated.
I'm really hoping someone can help me with this...
I need to plot percentages over time in a line graph in excel. I don't want to have to do a percentage equation in the spreadsheet, I just want excel to take two sets of values and display the percentage in the chart. For example, I need B1 as a percentage of B2 for week 1, C1 as a percentage of C2 for week 2, etc....
Can someone please offer a suggestion for how to do this? I would really appreciate it.
Also, would it be possible to link data from other sheets in the workbook into one single chart?
When I create a bar chart, the bars are horizontal. I want the chart bars to be vertical. It tried to rotate the chart so that it is vertical, but the "rotate" options are greyed out.
How do I get those bars vertical?
Does anyone know of a way to unhide this macro?
Thanks!
include/exclude one of the series to see how the chart changes, all the
colors change and we have to spend time re-identifying which series is
which, using the legend to check the colors.
Is there a way to "lock" the colors, so that the bars stay the same colors
regardless of whether other bars are included/excluded?
Thanks!
Keith
All I need is to know if there is an upward trend or downward trend of the numbers.... I can't have something that simply takes the first and last number and checks if it's higher or lower. I need to actually see if they are trending upwards. Also how would i go about making it so that if they are trending upwards it shows an up arrow, and down arrow for downwards...
And finally, if the trend continues at the same rate, how long it will take the number to reach a goal. Each data point will be 1 week apart, with an ultimate goal needed to be achieved at the end.
This will be a completely separate formula on the sheet....
Any help?
Here is my situation. I have been trying to learn macros but have not made one yet. Need your help. Here at work, I have some incompentant computer workers who claim they KNOW MS sooo well and have certificates etc... *COUGH COUGH* ya ok... LMAO
We have a "shared" work book we all work in. It's nothing fancy, just use it as a PO Book but since it is shared some people continue to not save before they add in more work so that they see a "refreshed" copy of the workbook before they start writing in cells that already contain information.
How to I create a macro button at the top of the page that is literally a SAVE button.. instead of them saving by going to File - Save or cntrl+s ??? I just thought that MAYBE having a big button in their face will remind them.
Secondly as back up I was wondering if you can create a macro to do a refresh of everyones screens automatically - say every 2 or 5 mins??? I don't mean a save... but a refresh so the screen actually updates in front of you. (although I will keep this little piece of magic out of their knowledge so they don't rely on it, just though it would be a secondary back up to helping eliminate these mishaps cause we are loosing alot of information by people saving overtop of other peoples work and not caring.)
Thanks so much!!!!! Muchly appriciated.
Can anyone help?
Thanks
Chris
where each cell/column begins and ends. However there are a few cells where
the break with the next cell does not show the line.
I have highlighed the cell in question, gone to format/cell/borders and
everything looks fine. Black color + format border shows square with all
sides of square showing.
Any thoughts on how to fix these few random cells.
Thanks
Any suggestions would be fantastic!
thanks
What could be wrong?
Example
Fire Street #50 this cell contains 17 characters therefore I need to add the rest by adding blank spaces to reach 50 characters, otherwise the system I am exporting the data will not understand this cell
Thanks all!!
New to the forums.
I'm in the process of creating a new report and I'm stuck.
My report consists of a set target in a field, a score and percentage of target.
e.g Target is 400
score is 450.
Percentage is 1.125 of target. (=score/target)
Now what I would like to do is create a formula that does not go above 100% , but instead work in reverse if you go over the target.
E.g. Target 400 .. Score was 450 ... percentage of target is 87.5%
Thanks in advanced.