Calculating Percentage Of Completed Tasks In Various Rows |
Calculating Percentage Of Completed Tasks In Various Rows - Excel |
|
Hello,
I need help with calculating completed tasks that appear on random rows. I'm already using the formula =COUNTA(XX:XX)/COUNTA(XX:XX) but need it to automatically recognize which range of cells to apply the formula to. In the attached file, the projects are bolded and color filled. Column G calculates the non-bold/non-color filled cells below it that are completed which is indicated by an "X". The number of tasks below each project varies and currently we need to copy the formula and manually indicate which cells to calculate. Is there a formula or VBA code that can determine which of the following cells to calculate based on color fill or bold font? Any other ideas to make this work simpler without having to change the cell range for each project? I hope I explained my question well enough.
Similar Topics
the SUMIF function to sum only the cells in the range that are colored. Can
this be done? Can I enter something in the "criteria" part of the formula
that can do this?
=SUMIF(D3:D13,"criteria",D3:D13)
I also tried to use the CELL function's color feature, but I couldn't get it
to work right. I don't know how to get Excel to recognize if a cell is
colored in a formula.
=CELL("color",cell)
It might just be that I don't know what this means in Help:
"color" --> 1 if the cell is formatted in color for negative values;
otherwise returns 0 (zero).
Can anyone help?
I am working on a worksheet, and would like to have an entire row transferred to another worksheet based upon a certain cell's value.
Having searched through the many solved threads on this site, I attempted to customize some of the code to my worksheet. Not being proficient in Macro/VBA, I failed. I figured I would ask for help, and see if anyone can provide what I am looking for.
Basically, I am attempting to construct a "work in process" file, and would like all completed work to be deleted from the work in process sheet, and transferred to a sheet that contains a running list of all work completed.
Attached is an example of what I am working on. I would like Column Q (Status) to determine if a row can be moved to a sheet that contains the list of all work completed, and eliminated from the original sheet. Once Status is updated to "Complete", it would be helpful to be able to run a macro/click a button that would perform the transfer.
Can anyone assist?
Thanks!
The code works, but it really slows my worksheet down when opening. Is there better way to write this? Thanks!
Code:
Dim myRange As Range Dim cell As Range Set myRange = Range("V6:V50000") For Each cell In myRange If cell.Value < 2 Then cell.Font.ColorIndex = 5 If cell.Value < 1 Then cell.Font.ColorIndex = 3 Next
Per say here is what I am trying to do
If a certain "word" is used from the drop down list I want the background of
that cell to change its color to "green." And if later I change the "word" to
another from the drop down list, it will change it's color to a specified
color.
The drop down list that I use was created from cells that have the colors
already in the "word", but I do not know how to make the list show the colors
so it puts the word & color automatically in the drop down list to the cell
with the drop down (if that makes any sense).
If there is a way, please spell it out simple enough for me to understand,
as I don't know fully the capabilities of formulas or vba.
On the attached timesheet there are columns IN, OUT, IN,OUT
The lunch time is worked out by deducting 'C8 from C9' and this works fine when all 'IN, OUT' cells are filled in but for some reason when just the first two cells are filled in it gives a -12 hour answer.
looking at cell 'C11 ' in the attached worksheet, I currently have the formula
=IF(C13=0,","SUM(C9-C8)) The reason for this is to make it look tidy by having blank cells until a calculation is needed,, My problem is, If someone just comes in for the morning one day for instance 8am to 12 noon then they won't have lunch, but C11 will show -12:00
Can I put another formula into C11 to tell it not to deduct C8 from C9 until a time is put into C9.
The following is the sort of thing (many variations) I have been trying but because I'm hopeless at formulas I'm not having any success
Thanks
=IF(C13=0,","SUM(C9-C8))OR,IF(C9,ISBLANK,"",SUM(C9-C8)
statement? What I have in mind is something like this (stated simply): If
cells B9 or N9 or Z9 or AL9 are blank, do nothing, else color text in cell S4
red.
I would like to have a new row automatically inserted with the formulas
updating to reference the cells in the new row. Let's say I start with 50
rows and after they are filled up, a new row is added automatically? How do I
do this?
to the email address, like change the font color or change on letter, Excel
tries to email the address. If I click in the formula bar to make the
changes, it automatically changes it back to all blue text and underlined. I
have tried to format all of the cells as "Text" to show as entered, but it
doesnt work. PLEASE HELP
date range that was provided, and to return Early, Late or Ok accordingly.
Received Date & Time: 10/29/2010 3:27:00 PM
Completed Date & Time: 11/1/2010 3:57:32 AM
Business Hours: 08:00 AM to 05:00 PM
Non Business hours: 05:00 PM to 08:00 AM
Weekdays : Monday to Friday
Weekends: Saturday & Sunday
If I calculate TAT for this time period it should show me 1 hour 33 minutes, why because business hours are closing by 5:00 PM on 10/29 so it should not calculate duration after 5:00 PM to until 08:00 AM on next day, however 10/29 is Friday so formula should calculate the duration from 10/29 Friday 3:37 PM to 10/29 5:00 PM and again it should calculate from 8:00 AM on 11/01 Monday and formula should skip Saturday & Sunday.
In this scenario I have completed the task before 8:00 AM on 11/01 so it should show duration of 1hour 33 minutes.
Please let me know if you need any more details
I am trying to calculate our On Time Delivery. I want this as a simple percentage of jobs. I have got this running in the following way:
Column M - Estimated Delivery dates
Column N - Actual Delivery dates
Column O - =IF(SUM(M2-N2)>0,1,0)
Then I have calculated On Time Delivery as: =SUM((SUM(O2:O252))/(COUNTA(N2:N252)))
This seems to work fine. My problem is, if we enter a date in Estimated without a corresponding Actual date, the formula for Column O fills out anyway and improves our On Time Delivery Percentage. How can I set this up so that the formula doesn't calculate if there is no data in Column N?
Any help much appreciated
Thanks,
James
I have a file that has 8 sheets. the first seven sheets are the days of the week and the 8th sheet is where I want to calculate the hours.
The days of the week consists of "Name" "Date" Hours"
The 8th sheet consists of "Name", "Days of the week in their own column (7 columns in total)", "Total Hours" and "Total Days Worked"
Now... each day is always a different group and what I'm hoping for is to create a formula that can grab each name with their hours and throw them into the 8th sheet. So when the end of the week is done I have all the Employees weekly hours and days worked all finished.
I hope this makes sense. This file is to track about 100 employees that are on a rotational work schedule.
I have attached a sample file.
Thanks in advance for your help.
I have created a complex formula to help me calculating Golf handicaps for players.
The formula is in the first cell and I want to drag the formula across to the right to cover the 18 holes.
But ALL the values change and I want some to change and some to stay constant.
How do I tell excel to drag the formula across but keep certain parts of the formula the same..ie ....=D11.... in the formula when dragged across doesn't go D12,D13;D14 in each cells formula and should stay as D11 for all.
Many thanks for your help
Ole
I'm very new to Excel, and I'm having trouble figuring a few things out. Hopefully this will be very easy for you guys!
In Sheet 1, I have a column of cells that I would like to also appear in Sheet 2. If I add a new row to the column in Sheet 1, I would also like it to be updated automatically in Sheet 2. Currently, I can get it to show the contents of individual cells from Sheet 1 in Sheet 2 by using this formula in the formula bar for each cell in Sheet 2:
=Sheet1!A3 (or whichever cell it is)
That's fine, but I'd like to just have a formula that will reproduce the entire column (ie. without a fixed range, as new rows are going to be added to the column).
If anyone could point me in the right direction, I'd be very very grateful. Thanks.
But it gets even more weird. When I click on the Column C cells and then it shows the formula up top in the formula bar and if I put my cursor anywhere in the formula bar and hit Return the formula does not change however the correct value then appears in the Column C cell. It is like the act of putting the cursor in the formula activates it to work properly but until it is activated that C cell shows the value of the cell which it was dragged down from.
This is quite bizarre. Has anyone ever seen this before? I have no idea what is going on. I ran a scan for viruses and none were found. I tried it on several new/different spreadsheets but it keeps happening.
Thanks for any tips on this.
triangle. I copied it to create a new data set and used find &
replace to change the worksheet references to the new ones.
The cells still contain the result of the old formula referring to the
previous worksheets. The only way I can get the formula to return the
correct result is to edit (F2) each cell and press enter. Calc now
(F9) does nothing.
I've seen this before, but this time, I need to calculate many
thousands of cells and don't have time for this workaround.
Any ideas?
Thanks.
Don S