Excel VBA Course
Excel VBA Course - From Beginner to Expert

200+ Video Lessons
50+ Hours of Video
200+ Excel Guides

Become a master of VBA and Macros in Excel and learn how to automate all of your tasks in Excel with this online course. (No VBA experience required.)

View Course

(80% Discount Ends Soon!)

Close Window (X)   
Excel VBA Course
[80% Discount] Excel VBA Course - From Beginner to Expert

200+ Video Lessons
50+ Hours of Video
200+ Excel Guides

Become a master of VBA and Macros in Excel and learn how to automate all of your tasks in Excel with this online course. (No VBA experience required.)

View Course

(80% Discount Ends Today!)

How Do You Calculate Rate Of Return On Monthly Cash Flows

Can I use the IRR formula for internal rate of return calculations for
monthly cash flows? If so do I multiply the result by twelve? If not how do I
calculate the annual IRR using monthly cash flows?

Thanks for your help.





Excel VBA Course
Excel VBA Course - From Beginner to Expert

200+ Video Lessons 50+ Hours of Instruction 200+ Excel Guides

Become a master of VBA and Macros in Excel and learn how to automate all of your tasks in Excel with this online course. (No VBA experience required.)

(80% Discount Ends Soon!)

View Course




Similar Topics







I am trying to copy balances from one worksheet to another over a total of 12
worsheets ..... this is for petty cash monthly sheets and I need a running
total over the 12 sheets.

At present I have to do this manually .... is there a formula that I can use
that will automatically carry the balances over

Thanks for your help



Entering time values in custom format [h]:mm:ss
Cells accept hours over 23,
Adding cells in column returns correct total time.
Have not found a way to multiply these cells by a $ hourly rate.
So use HOUR(cell ref) and MINUTE(cell ref) to capture values in referenced
cell - then use these values to calculate total payment for $rate per hour.
However, the HOUR(cell ref) formula returns the hours in excess of 24 when
the cell contains an hour value in excess of 23 (ie 27 hours returns 3).




I'm trying to figure out what the formula is to multiply the total hours worked per week by their hourly pay for each individual. kind of like the
=Sum(I25:I32) Formula but I want to multiply the outcome of that formula by the hourly rate of 11.00, 15.00 and 16.00. Does anybody know how this can be done? If so I would greatly appreciate it.
Thanks!
charitydc


I have an excel worksheet that adds two other worksheets in a data
triangle. I copied it to create a new data set and used find &
replace to change the worksheet references to the new ones.

The cells still contain the result of the old formula referring to the
previous worksheets. The only way I can get the formula to return the
correct result is to edit (F2) each cell and press enter. Calc now
(F9) does nothing.

I've seen this before, but this time, I need to calculate many
thousands of cells and don't have time for this workaround.

Any ideas?

Thanks.

Don S



Very new in this board. If I post this question in the wrong forum please bear with me.
There is about 20 staffs in our department and I have made a spreadsheet with 12 tabs for each month of the year Jan-Dec. If each staff have 15 days annual leave each year and how can I make a formular that can automatically calculate the balance of annual leave and entered in the tabs of the following months. For example if staff A used 5 days in Jan how can the balance of 10days be entered in the tabs from Feb-Dec. If he use another 5 days in July the remain balance of 5 days be automatically entered in the tab from Aug to Dec. Likewise if staff A took 2 days sick leave in Jan, and 2 days in Mar how can this sick days be automatically sum up in the months after. I am doing this manually at the moment and it is very time consuming and also very easy to make mistake.
Thanks and sorry for this long questions


I need a formula to automatically calculate if the Job was completed in the
date range that was provided, and to return Early, Late or Ok accordingly.



I need a formula to calculate Turn Around Time. Find below the sample data and details for your reference.

Received Date & Time: 10/29/2010 3:27:00 PM
Completed Date & Time: 11/1/2010 3:57:32 AM
Business Hours: 08:00 AM to 05:00 PM
Non Business hours: 05:00 PM to 08:00 AM
Weekdays : Monday to Friday
Weekends: Saturday & Sunday

If I calculate TAT for this time period it should show me 1 hour 33 minutes, why because business hours are closing by 5:00 PM on 10/29 so it should not calculate duration after 5:00 PM to until 08:00 AM on next day, however 10/29 is Friday so formula should calculate the duration from 10/29 Friday 3:37 PM to 10/29 5:00 PM and again it should calculate from 8:00 AM on 11/01 Monday and formula should skip Saturday & Sunday.

In this scenario I have completed the task before 8:00 AM on 11/01 so it should show duration of 1hour 33 minutes.

Please let me know if you need any more details


How can I calculate a 3% anual rent increase over 15 years (3% over the last year's rent)?


I have a spreadsheet that when I copy the formula, it copies correctly
(changes the cells it should subtract), however, the result stays the same.
It matches the formula I copied it from, even though the cells to calculate
are now different. I even did a paste special and said only formula, but
still, same result. If I actually type in the formula, it works fine, but I
have a lot I need to copy and paste. Is there a way I can fix this?

Thanks,



I am using the following formula to calculate the number of days between a date and the current date: =DATEDIF(A1,TODAY(),"d") What do I add to the formula to leave cell blank if no date is entered in the cell for calculation.


I have a spreadsheet where I need to calculate the increase in % one year over the other in column D for Eg if Profits are 95415 in Jan 2008 (Column B) and 80215 in Jan 2008 (Column C), then the % Increase will be (95415-80215)/80215 *100

I can calculate the formula for this , but the problem comes where for eg there is a loss in Jan 2008 for -95415 and there was a profit in Jan 2007 for 80215. How do I set up formula to take negatives & positives into account in calculating the increase or decrease/

Your assistance or anybody's on the forum will be greatly appreciated

Regards

Howard

http://www.mrexcel.com/forum/showthr...ghlight=howardneed


Hello,

I have two columns of data: column A contains the date and time in the form dd/mm/yyyy. Column B contains a number value. All the times are in order, so column A looks like:

01/01/2007
02/01/2007
03/01/2007

I have data from 2007 to 2010. I need to calculate an average daily value (in column B) for each month, and display it in column C. So, for January, I need to calculate the average of 31 days, February, 28 days, etc.

Is there a function I can use to do this? I've been trying the AVERAGEIF formula but can't get it to work. Any ideas would be much appreciated!

Many thanks,
Caitlin


Hi there

I am trying to calculate our On Time Delivery. I want this as a simple percentage of jobs. I have got this running in the following way:

Column M - Estimated Delivery dates
Column N - Actual Delivery dates
Column O - =IF(SUM(M2-N2)>0,1,0)

Then I have calculated On Time Delivery as: =SUM((SUM(O2:O252))/(COUNTA(N2:N252)))

This seems to work fine. My problem is, if we enter a date in Estimated without a corresponding Actual date, the formula for Column O fills out anyway and improves our On Time Delivery Percentage. How can I set this up so that the formula doesn't calculate if there is no data in Column N?

Any help much appreciated

Thanks,

James


Good afternoon!

I'm working with Excel 2003 sp 3 on Windows xp.

I have been banging my head trying to jar loose the formula to calculate man days where 1 equals 8 hours. I have one that was given to me by a coworker:

=INT(Q3/8)+(((Q3/8)-(INT(Q3/8)))*0.8)

That calculates man days from total hours. I need a formula that will total man days and return the man day answer. Example:

weekending 12/25 = 16.2 which is 16 man days and 2 hours
weekending 1/1 = 24.7 which is 24 man days and 7 hours

Total = 41 man days and 1 hour

I have also been asked if there was a way for a number to be entered into a spreadsheet and automatically put in order without a macro or "pushing a button".

Any advice is greatly appreciated!

Happy New Year!

~ Brenda ~


This formula is supposed to calculate difference between today and date hired to give years and months of service. Works fine for all except if the person was hired in year 2000 then this formula shows 110 y. Any one know how to fix this? or have a different formula that works.

=DATEDIF(E21,TODAY(),"y")&" y "&DATEDIF(E21,TODAY(),"ym")&" m"

Thanks
Rick


I need information on how to enter the proper syntax (formula) so that excel
can calculate overtime hours. In california over 8 hrs in one day is
overtime. The 8 would be considered regular hours and anything over is OT.



I often use if statements to return empty cells, for example:

=IF(a1=0,"ERROR","")

The trailing "" returns an empty cell. The problem is, it is not TRULY empty. If I fill that formula down, I cannot, for example, jump from one "ERROR" cell to the next by hitting Ctrl arrow-down because it seems to think that these empty cells have contents.

Is there a way to designate, in such a formula as above, to return a TRULY empty cell?

Thanks


On my calculator, if I divide 462,534.05 by 335 I get 1,380.70. Then if I times 1,380.70 by 335 I get 462,534.50. Which is what I need it to be because I need to calculate the difference of a figure not dividing equally.

On excel, if I divide 462,534.05 by 335 I get 1,380.70. Then if I times 1,380.70 by 335 I get the SAME result of 462,534.05.

I have to account for the difference of not dividing equally so there is some format or accounting function that's preset that I don't want but I have no idea how to fix it or format my excel sheet to calculate as my calculator would.

Please can someone help? Thanks!


In Excel I have been trying to find an easier way to calculate a time
difference where the times cross midnight. Example:
Start time: 23:50:00
End time: 00:15:00

How would you formulate an equation to determine the duration of time or
differnce between the start and end time?