Time In X Axis Defaulting To 12:00??? |
Time In X Axis Defaulting To 12:00??? - Excel |
|
I want to create a chart for each 15 minute increment in the day for 22 days.
Example -
Chart 1 (x axis):
Mon 5 2 12:00 AM , Tue 5 3 12:00 AM , ... Tue 5 24 12:00 AM
Chart 2 (x axis):
Mon 5 2 12:15 AM , Tue 5 3 12:15 AM , ... Tue 5 24 12:15 AM
The problem is that on the second chart, the dates show up correctly, but the increment is supposed to be 12:15, and it still shows 12:00.
I thought the chart was trying to round down, but I experimented on higher intervals, and it still did the same thing. I'm thinking it might be a scale issue? I'm not too sure, so if you got any ideas on what I'm doing wrong, please let me know!
Similar Topics
Instead of the y axis being on the left hand side, i wish for it to cut at 0,0. I have positive and negative values and I need it to be in the centre instead of on the left.
I have tried formatting both the axis and it would appear that the x axis already cuts the y axis in the right posistion so i need to format the x axis to make the y axis cut it at 0,0. I have already tried typing in 0 instead of 1 and it keeps saying it need to be number more than or equal to 1.
Any help would be greatly appreciated.
Nicole
When I create a bar chart, the bars are horizontal. I want the chart bars to be vertical. It tried to rotate the chart so that it is vertical, but the "rotate" options are greyed out.
How do I get those bars vertical?
I have 3 variables that I'm charting. I have one on the primary axis and it's values are in the billions. I have one on the secondary axis and it's a percentage. I need to display a 3rd who's value is in the millions. If I put it on the primary axis, you cannot see modest changes.
Is there a tricky way to get all three on one graph? I know I could split on two graphs, so that's my backup plan.
Thanks,
Dave
include/exclude one of the series to see how the chart changes, all the
colors change and we have to spend time re-identifying which series is
which, using the legend to check the colors.
Is there a way to "lock" the colors, so that the bars stay the same colors
regardless of whether other bars are included/excluded?
Thanks!
Keith
I was thinking of trying a nested if/and statement but I haven't quite figured out how to do it. Basically I want to identify the two values where it switches from positive to negative and also indentify the values where it goes negative to positive, I can then fit a straight line between them to find a better approximation of the intercept (though it might not be necessary). Preferably I'd like it all one function as I'm not doing it in VBA (I might do later though, we'll see).
Can anyone suggest how I'd find these value or the x-intercept. Any help would be greatly appreciated.
I'm really hoping someone can help me with this...
I need to plot percentages over time in a line graph in excel. I don't want to have to do a percentage equation in the spreadsheet, I just want excel to take two sets of values and display the percentage in the chart. For example, I need B1 as a percentage of B2 for week 1, C1 as a percentage of C2 for week 2, etc....
Can someone please offer a suggestion for how to do this? I would really appreciate it.
Also, would it be possible to link data from other sheets in the workbook into one single chart?
Is there a way to have the Min and Max values adjusted dynamically for the Scale of the values being displayed ??
I know that I can use named ranges to display various sections of data -- month by month, or quarter by quarter, for example.
But when the value of these ranges vary greatly from section to section I end of having to manually go and adjust the Min and Max values of the chart scale.
For example, if I was looking at a graph of the S&P 500's prices last November, a Min and Max range of 750 to 1200 would be fine. But if I had a dynamic range established and scrolled over to view the S&P 500's prices for this past February, I would need a Min and Max range of around 650 to 850.
Is there a way to have these Min & Max values adjust automatically depending on the values being displayed ??
Thanks
StanSz
Firstly i haven't used excel to a great extent since my college days. So i'm having to re-learn 99.9% of everything i once new...
I am volunteering for a non profit organization and trying to create a reservation system for the rooms that they have - kind of like hotel software, but in excel (i did a similiar thing in college but for plane seats)
Please find it attached.
What i need it to do:
Copy all of the info from the main page to the guest lit (a new row each time).
From the guest list to the Gannt chart - i did a few tutorials on dynamic gantt charts using conditional formatting but cannot get them to work when based on data on a different worksheet.
Finaly is there a way to check for availabilty on any given date?
if just someone could point me in the right direction, i would be appreciate it so much words can't express!!!
Best Regards,
Jamie
P.S for the calender drop down on the main page, i'm using 'microsoft time & date picker 6.0)
http://www.2shared.com/file/6521961/...ibsV05b32.html - pop ups on this site
http://www.easy-share.com/1906519167/RibsV0.5b3.2.xlsm - same file, better website
my text entries are rather lengthy. The past two weeks these lengthy entries
are showing up as pound signs (#########) when I click off the cell. I know
the text will fit in the cell, and the problem isn't solved by making the
cell bigger or using a little bit less text. I have the cells formatted as
"text" and "wrap to fit". I have printed the pages and the printed version
also has pound signs. I just want my text to show up!
B value Time of day punch in: 9:30 AM
C value =IF(D11="","","-")
D value Time of Day punch out: 6:00 PM
E value =IF(D11="","",IF(D11
We will be building 8 "widgets" a day.
We will work 10 hours a day.
There is a 20 minute break at 9:20 am.
Production shuts down for lunch 30 minutes for lunch at 12:30.
Production starts at 6:00 am.
Here is what I can do.
Production cycle time = (10*60)-30/8 or 71.25 minutes
If we start at 6:00 am, the first scheduled cycle completion time = TIME(6,0,0+71.25/1440)
My problem is when I am trying to use a logical "IF' statement to account for the 20 minute break or lunch and still calculate the end of each cycle time through the day I receive a number of error messages.
This is the formula I am trying to make work. I have the cell the formula is in, formatted with a "mm,ss" format.
=(IF(D4+G1/1440>9:20,(D4+G1)/24,(D4+G1+15)/1440))
I have included an attachment to help (a picture is worth a thousand words).
Any help will be greatly appreciated.
I have bought a number of books in an attempt to figure this out, and I am still stumped
Basically, I've got a sheet that contains a table of entries, and each entry gets a date stamp in the first column. I would like to have the sheet display the average time, in days, between entries. Is this possible?
Thank you in advance!
~cp
Every so often when I attempt to save a file, (including save as), Excel won'r let me. By won't let me I mean:
using Save doesn't appear to do anything using Save As doesn't either do anything, the dialog is not displayed and if I am doing via the File menu then the File menu is exited and the previous ribbon tab is displayed (i.ethe one I was on before clicking 'File') if I close the workbook I am prompted to save, close without saving or cancel. Clicking save just invokes the same msgbox again. I can't work out when it goes into this mode. Some days I can work without this problem, other days I encounter this 2 or 3 times.
The only thing I could suspect was I think this started around about the time I installed xlDennis' code library. I have uninstalled the addin and so far so good, but I cannot categorically say that this was the cause.
Anyone have any idea?
Cheers
Jon
Edit: I have read this: http://support.microsoft.com/kb/271513
Doesn't seem to cover the issue I describe
On the attached timesheet there are columns IN, OUT, IN,OUT
The lunch time is worked out by deducting 'C8 from C9' and this works fine when all 'IN, OUT' cells are filled in but for some reason when just the first two cells are filled in it gives a -12 hour answer.
looking at cell 'C11 ' in the attached worksheet, I currently have the formula
=IF(C13=0,","SUM(C9-C8)) The reason for this is to make it look tidy by having blank cells until a calculation is needed,, My problem is, If someone just comes in for the morning one day for instance 8am to 12 noon then they won't have lunch, but C11 will show -12:00
Can I put another formula into C11 to tell it not to deduct C8 from C9 until a time is put into C9.
The following is the sort of thing (many variations) I have been trying but because I'm hopeless at formulas I'm not having any success
Thanks
=IF(C13=0,","SUM(C9-C8))OR,IF(C9,ISBLANK,"",SUM(C9-C8)
I'm thinking there has to be a more automated way to discover the best unique key of existing fields and their data. I thought I'd post this as a challenge because I don't know the "right" (or better) answer.
Anyone have any ideas?
I have the following in G2:
=VLOOKUP(A2,Sheet1!A:D,4,FALSE)
The formula returns the correct result, which in this case is a number - 2
When I fill down my range, the formula copies correctly, but every result is the same. 2.
However, if I go to the next cell down (G3) and activate it by pressing F2, and then hit Enter, the result changes and is now correct.
Any ideas whats going wrong?
Received Date & Time: 10/29/2010 3:27:00 PM
Completed Date & Time: 11/1/2010 3:57:32 AM
Business Hours: 08:00 AM to 05:00 PM
Non Business hours: 05:00 PM to 08:00 AM
Weekdays : Monday to Friday
Weekends: Saturday & Sunday
If I calculate TAT for this time period it should show me 1 hour 33 minutes, why because business hours are closing by 5:00 PM on 10/29 so it should not calculate duration after 5:00 PM to until 08:00 AM on next day, however 10/29 is Friday so formula should calculate the duration from 10/29 Friday 3:37 PM to 10/29 5:00 PM and again it should calculate from 8:00 AM on 11/01 Monday and formula should skip Saturday & Sunday.
In this scenario I have completed the task before 8:00 AM on 11/01 so it should show duration of 1hour 33 minutes.
Please let me know if you need any more details