Calculate Sscc 18 Check Digit |
Calculate Sscc 18 Check Digit - Excel |
|
here is how I just don't know how to make excel do it.
Number without Check Digit
6 2 9 1 0 4 1 5 0 0 2 1
you multiply starting on the left the first digit by 1 (6*1) the second digit by 3 (2*3) the third digit by 1 (9*1) the fourth digit by 3 (1*3) and so on
you take the sum of that(57) and subtract it from the nearest equal or higher multiple of ten (60-57=3) to get the check digit of 3
you end up with this
6 2 9 1 0 4 1 5 0 0 2 1 3
I have 932 of these to calculate
Thanks
Similar Topics
format the cells so that only the first 6 digits show up. Is this possible?
The following can be used to simulate the same, and avoid having to achieve the same with VBA's IsDate function:
STEPS:
1- Format the column (ex A) as text
2- Formula to check for valid dates:
=ISERROR(DATEVALUE(A1))
I have two columns of data: column A contains the date and time in the form dd/mm/yyyy. Column B contains a number value. All the times are in order, so column A looks like:
01/01/2007
02/01/2007
03/01/2007
I have data from 2007 to 2010. I need to calculate an average daily value (in column B) for each month, and display it in column C. So, for January, I need to calculate the average of 31 days, February, 28 days, etc.
Is there a function I can use to do this? I've been trying the AVERAGEIF formula but can't get it to work. Any ideas would be much appreciated!
Many thanks,
Caitlin
Received Date & Time: 10/29/2010 3:27:00 PM
Completed Date & Time: 11/1/2010 3:57:32 AM
Business Hours: 08:00 AM to 05:00 PM
Non Business hours: 05:00 PM to 08:00 AM
Weekdays : Monday to Friday
Weekends: Saturday & Sunday
If I calculate TAT for this time period it should show me 1 hour 33 minutes, why because business hours are closing by 5:00 PM on 10/29 so it should not calculate duration after 5:00 PM to until 08:00 AM on next day, however 10/29 is Friday so formula should calculate the duration from 10/29 Friday 3:37 PM to 10/29 5:00 PM and again it should calculate from 8:00 AM on 11/01 Monday and formula should skip Saturday & Sunday.
In this scenario I have completed the task before 8:00 AM on 11/01 so it should show duration of 1hour 33 minutes.
Please let me know if you need any more details
can calculate overtime hours. In california over 8 hrs in one day is
overtime. The 8 would be considered regular hours and anything over is OT.
I can calculate the formula for this , but the problem comes where for eg there is a loss in Jan 2008 for -95415 and there was a profit in Jan 2007 for 80215. How do I set up formula to take negatives & positives into account in calculating the increase or decrease/
Your assistance or anybody's on the forum will be greatly appreciated
Regards
Howard
http://www.mrexcel.com/forum/showthr...ghlight=howardneed
I am trying to calculate our On Time Delivery. I want this as a simple percentage of jobs. I have got this running in the following way:
Column M - Estimated Delivery dates
Column N - Actual Delivery dates
Column O - =IF(SUM(M2-N2)>0,1,0)
Then I have calculated On Time Delivery as: =SUM((SUM(O2:O252))/(COUNTA(N2:N252)))
This seems to work fine. My problem is, if we enter a date in Estimated without a corresponding Actual date, the formula for Column O fills out anyway and improves our On Time Delivery Percentage. How can I set this up so that the formula doesn't calculate if there is no data in Column N?
Any help much appreciated
Thanks,
James
difference where the times cross midnight. Example:
Start time: 23:50:00
End time: 00:15:00
How would you formulate an equation to determine the duration of time or
differnce between the start and end time?
Can you please help me,
A1= time in
B1= time out
C1= time in
D1= time out
I want to calculate the late and under time,
Office start at 9:am w/30 mins Grace period,
The break time is one hour only, please include over breaktime in calculation.
End of office hours 6:00 pm, strickly no over time
On excel, if I divide 462,534.05 by 335 I get 1,380.70. Then if I times 1,380.70 by 335 I get the SAME result of 462,534.05.
I have to account for the difference of not dividing equally so there is some format or accounting function that's preset that I don't want but I have no idea how to fix it or format my excel sheet to calculate as my calculator would.
Please can someone help? Thanks!
This is what I have so far (hire date is in column B):
=((TODAY()-B4)/365)&" YEARS"
This function gives me a number with many decimal places.
I tried:
=ROUNDDOWN((TODAY()-B4)/365),0)&" YEARS"
It tells me I have too few arguments. Please help!
triangle. I copied it to create a new data set and used find &
replace to change the worksheet references to the new ones.
The cells still contain the result of the old formula referring to the
previous worksheets. The only way I can get the formula to return the
correct result is to edit (F2) each cell and press enter. Calc now
(F9) does nothing.
I've seen this before, but this time, I need to calculate many
thousands of cells and don't have time for this workaround.
Any ideas?
Thanks.
Don S
I need help....I am working production scheduling with Start and End time but there is a lunch time and tea time. Is there any formula to calculate Start time to End time with excluding lunch time?
Here is example :
Lunch time :12:00pm to 1:00pm.
Duration Process :6 hours.
Start Time (8:00am)
End time (5:00 pm)
I need a formula to calculate from Start Time 8:00am and what is the End Time? with 1 hour lunch time...
Thanks,
ET
My question is:
Is there a way to check for duplicates, and then automatically add numbers to the duplicate values to make them unique? If so, how can this be done?
So that you will have this:
JohnSmith
JohnSmith2
JohnSmith3
JaneDoe
JaneDoe2
JohnAdams
JohnAdams2
JohnAdams3
JohnAdams4
I think I have done a good job in illustrating what I would like to be able to do, but if there is still something that is unclear, I will post whatever clarification is needed.
Thank you in advance for your help!!
There is about 20 staffs in our department and I have made a spreadsheet with 12 tabs for each month of the year Jan-Dec. If each staff have 15 days annual leave each year and how can I make a formular that can automatically calculate the balance of annual leave and entered in the tabs of the following months. For example if staff A used 5 days in Jan how can the balance of 10days be entered in the tabs from Feb-Dec. If he use another 5 days in July the remain balance of 5 days be automatically entered in the tab from Aug to Dec. Likewise if staff A took 2 days sick leave in Jan, and 2 days in Mar how can this sick days be automatically sum up in the months after. I am doing this manually at the moment and it is very time consuming and also very easy to make mistake.
Thanks and sorry for this long questions
=DATEDIF(E21,TODAY(),"y")&" y "&DATEDIF(E21,TODAY(),"ym")&" m"
Thanks
Rick
I have a file that has 8 sheets. the first seven sheets are the days of the week and the 8th sheet is where I want to calculate the hours.
The days of the week consists of "Name" "Date" Hours"
The 8th sheet consists of "Name", "Days of the week in their own column (7 columns in total)", "Total Hours" and "Total Days Worked"
Now... each day is always a different group and what I'm hoping for is to create a formula that can grab each name with their hours and throw them into the 8th sheet. So when the end of the week is done I have all the Employees weekly hours and days worked all finished.
I hope this makes sense. This file is to track about 100 employees that are on a rotational work schedule.
I have attached a sample file.
Thanks in advance for your help.
(changes the cells it should subtract), however, the result stays the same.
It matches the formula I copied it from, even though the cells to calculate
are now different. I even did a paste special and said only formula, but
still, same result. If I actually type in the formula, it works fine, but I
have a lot I need to copy and paste. Is there a way I can fix this?
Thanks,
Cell B5: start time: 4:15 formatted as 4:15:00 am
Cell B6: finish time: 6:15 formatted as 6:15:00 am
Cell B7: total time: 2:00 formula in cell: =TEXT(B6-B5,"h:mm")
Cell B8: total batches processed: 22 (this is entered manually)
Cell B9: batches per hour: formula in cell: =B8/TEXT(B7,"h")
as long as I have this formula in cell B9 the answer comes out correct which should be 11 per hour.
If the formula in B9 is B8/B7, the answer is 264.0, Is this because of the way excel is reading the total time or the total time is formatted as a time, not an actual number? Is this the correct way to solve the problem?
answer should be 11 per hour.